WE COVERED A LINOLEUM FLOOR WITH CERAMIC TILES. CUSTOMER DID NOT WANT TO TEAR OUT THE OLD FLOOR, SO WE BUILT RIGHT OVER IT AND BUILT A CUSTOM THRESHOLD TO CONNECT THE ROOMS.
![]() THE CEMENT BOARD WAS INSTALLED OVER EXISTING LINOLEUM |
![]() THE TILING BEGINS |
![]() ABOUT HALF TILED |
![]() A CLEAN WORKPLACE IS A SAFE WORKPLACE |
![]() AFTER THE INSTALLATION THE FLOOR WAS ALLOWED TO CURE OVERNIGHT |
![]() AFTER THE FLOOR HAD CURED THE GROUT WAS SPREAD AND ALLOWED TO CURE |
![]() WHEN THE GROUT SET IT WAS TIME TO SEAL THE FLOOR |
![]() THE FINISHED PRODUCT |
STEVE NEWTON, OWNER
EMAIL: STEVE@SLNCONSTRUCTION.COM
PHONE: (518) 892-7100
BENNINGTON, VT 05201