 DAY ONE, BRING ALL EQUIPMENT
|
 AND MATERIALS ON SITE.
|
 HERE WE ARE REMOVING THE TOPSOIL.
|
 WITH THE TOPSOIL REMOVED WE COMPACT THE TRENCH.
|
 NEXT WE FILL THE TRENCH WITH SIX INCHES OF CRUSHED STONE.
|
 THIS WILL GIVE US A GOOD BASE FOR BUILDING THE RETAINING WALL.
|
 WITH THE STONE IN PLACE AND COMPACTED WE BEGIN TO BUILD THE WALL.
|
 IT IS VERRY IMPORTANT THAT THE FIRST RUN OF BLOCKS BE LEVEL,IF THEY ARE NOT IT WILL THROUGH OFF THE OTHER COURSES.
|
 AFTER THE FIRST COURSE IS BACK FILLED AND COMPACTED WE BEGIN TO LAY THE 2ND.
|
 DRAINAGE IS VERY IMPORTANT WEN BUILDING A RETAINING WALL.
|
 AFTER BACK FILLING THE 2ND COURSE A REINFORSMENT GRID IS LAID IN PLACE. THIS WILL PREVENT THE WALL FROM MOVING UNDER PRESHURE.
|
 WE NOW CAN START THE 3RD COURSE. AFTER THIS IS BACK FILLED AND COMPACTED WE USE MASONRY ADHEASIVE TO SECURE THE CAP STONES.
|
 AFTER A DELIVERY OF GRAVEL WE BEGIN TO BACK FILL AND LEVEL THE PARKING LOT.
|
 SOME RAKEING AND COMPACTION AND WE WILL BE DONE.
|
 A FINAL INSPECTION AND WE ARE FINISHED.
|